How it works

From intake to approved permit in three steps.

No quote forms, no sales calls, no deposits. Pick your vertical, bundle what you need, and check out online — your drafted plan set lands in 48–72 hours.

01

Choose your vertical & fill the intake

Pick from six verticals — Solar, EV Charger, Battery Storage, Generator, HVAC, or Main Panel Upgrade. Enter the property and contractor info, then attach the photos and specs your drafter needs. No account, no discovery call.

  • Six verticals
  • Vertical-specific fields (roof photos, panel photos, floor plan…)
  • Drag-and-drop photo + document upload
02

Pick your tier & bundle what you need

Your system size sets the published price from our tiered pricing. Bundle in EV, battery, generator, HVAC, MPU, or an engineer stamp — the total updates live in your order manifest before you pay a cent.

  • Live order manifest
  • Bundle add-ons into one checkout
  • PE/SE stamp available
03

Instant card checkout — delivered in 48-72 hrs

Pay by card. No deposit-then-invoice, no quote calls. Your AHJ-ready plan set lands in your inbox within 48-72 hours, ready to submit.

  • Guest checkout — no signup
  • Secure instant card payment
  • Delivered in your vertical's format
§04 What you get

What lands in your inbox

An AHJ-ready plan set

Drafted to your jurisdiction's format — site plans, single-line diagrams, and load calculations, prepared by real drafters, not auto-generated.

Delivered in the right format for your vertical

Drawn verticals (Solar, EV Charger, Battery, Generator, MPU) arrive as a submission-ready PDF plan set. HVAC Manual J/S/D reports arrive as a detailed calculation report. Every deliverable is linked from your order page and emailed directly.

Ready to start an order?

Pick a vertical and check out online — no call required.

Browse verticals

Questions before you order?

Ask us anything — we'll reply by email, usually within a few hours.