Main Panel Upgrade · Nationwide

Main Panel Upgrade (MPU) Documentation

Load calculations and permit-ready documentation for your service upgrade, AHJ-ready in 48–72 hours.

48–72 hr turnaround All 50 states from $175
Main Panel Upgrade installation
Configure your order

Select your option

Standalone pricing. Add a Solar, EV, or Generator order to this cart to unlock the $75 add-on rate.

Standalone order

Already have plans from another source?

Our Stamp My Existing Plans service is a separate standalone offering — upload a plan set you already have for independent engineer review and stamping. No plan set purchase required.

Learn about Stamp My Existing Plans

Live Order Manifest

Select an option to start your order.

What you'll receive

Your plan set, drafted and AHJ-ready

A sample of the drafted sheets included in a typical permit-ready package.

Main Panel Upgrade permit plan set sample

Drafted to your AHJ's format

Sheets are formatted to your jurisdiction's requirements — site plans, single-line diagrams, and load calculations.

48–72 hour turnaround

From intake to delivered plan set, most orders are completed within two business days.

Free AHJ revisions

If your AHJ requests corrections, we revise at no extra cost until your permit is approved.

What's included

Everything your AHJ expects, in one package

Load calculation (NEC Article 220) justifying the new service size
Site plan or satellite view showing existing and proposed panel location
Updated panel schedule reflecting the new main service
Single-line diagram showing new service equipment
Required labels and placards
Main Panel Upgrade FAQs

Questions about main panel upgrade plan sets

Most homes with a 100A panel considering solar, an EV charger, or a generator with significant load may need an upgrade to 200A or larger. If unsure, check your main breaker rating or ask your electrician.

No, this is the documentation package your electrician submits for permit. The physical panel swap is performed by your licensed electrician separately.

Drafting is our core service and doesn't include a stamp by default. Most standard residential systems don't require one. If yours does, we offer an independent licensed engineer's review as an optional add-on — see Engineer Stamp Review.

Free revisions for AHJ or utility-required corrections — unlimited, until your permit is approved, at no extra charge. If a revision is needed because of a change to your own project specs after ordering (different equipment, layout change, or missed site requirement not caused by the AHJ), a flat $75 revision fee applies to cover the redraw.

All 50 states.

Questions before you order?

Ask us anything — we'll reply by email, usually within a few hours.