Licensed PE stamps. All 50 states.
Structural and electrical stamps from independent licensed engineers. Whether we drafted your plans or you did.

Select a stamp review
Pick the discipline your AHJ requires. Selecting a different option replaces your current selection — it never stacks. Not sure which you need? Most residential rooftop systems need structural only. Commercial and larger systems usually need both. If your AHJ rejected a permit, the correction notice will say which discipline is missing.
Review policy — please read before ordering
We stamp plans that meet our engineer's standard as submitted. If your plans need corrections before they can be stamped, you'll be notified with specifics. At that point you can choose to: (a) have our drafting team make the required corrections for an additional fee, quoted after review, or (b) receive a refund of your stamp fee minus a $150 non-refundable review fee already incurred. We will never stamp plans that don't meet code or safety standards, regardless of payment.
Live Order Manifest
Pick a stamp review to build your order
This is a standalone service — you do not need to buy a plan set from us. You'll upload your existing plan set (PDF) and provide equipment details at checkout.
Independent review, stamp if it passes
Two disciplines, one stamp
Some jurisdictions require one, some both. Pick the discipline your AHJ asks for.
Structural stamp
Certifies the mounting, attachment method, and load path can carry wind, snow, and seismic loads. Applies to the structural sheets of your plan set.
Electrical stamp
Certifies the electrical design meets NEC — conductor sizing, overcurrent protection, grounding, and interconnection. Applies to the electrical sheets.
Many projects need only one. Commercial and larger systems typically need both, which is why we bundle them.
Stamped drawings, ready for any AHJ.
A sample of licensed PE stamps we apply across residential and commercial projects — reviewed against your local building department and utility requirements.
12k+ AHJs · 500+ Utilities

Alabama

Louisiana

Missouri

New York

California

New Hampshire
Questions about stamping plans you already have
If your plans need corrections before they can be stamped, you'll be notified with specifics. You can then choose to: (a) have our drafting team make the required corrections for an additional fee, quoted after review, or (b) receive a refund of your stamp fee minus a $150 non-refundable review fee already incurred. We will never stamp plans that don't meet code or safety standards, regardless of payment.
That add-on covers plans we draft for you. This service is for plans you already have from another source.
Turnaround depends on review complexity and is separate from our standard 48–72 hour drafting promise. After you upload your plan set, we confirm receipt and provide a review timeline based on the scope.
For nearly all projects, a licensed Professional Engineer (PE) in the appropriate discipline is what your AHJ requires. A small number of states — Illinois and Hawaii — require a separately licensed Structural Engineer (SE) to seal structural drawings. We arrange the correct license type for your jurisdiction automatically.






