Solar permit plan sets, drafted and AHJ-ready.
AHJ-ready drafted permit plan sets for rooftop and ground-mount solar — single-line diagrams, three-line diagrams, site plans, and electrical calculations. Pick your system size, add optional services, and check out — all in one cart.

Select your system size
Pricing is tiered by kW AC. Selecting a different size replaces your current selection — it never stacks.
Already have plans from another source?
Our Stamp My Existing Plans service is a separate standalone offering — upload a plan set you already have for independent engineer review and stamping. No plan set purchase required.
Learn about Stamp My Existing PlansLive Order Manifest
Select a system size to start your order.
Your plan set, drafted and AHJ-ready
A sample of the drafted sheets included in a typical permit-ready package.

Drafted to your AHJ's format
Sheets are formatted to your jurisdiction's requirements — site plans, single-line diagrams, and load calculations.
24–48 hour turnaround
From intake to delivered plan set, most orders are completed within two business days.
Free AHJ revisions
If your AHJ requests corrections, we revise at no extra cost until your permit is approved.
Everything your AHJ expects, in one package
Questions about solar plan sets
A complete, AHJ-ready drafted plan set with all sheets your building department typically requires — site plan, electrical diagrams, load calculations, and equipment schedules as applicable to the solar scope. You receive a clean, submittable PDF package.
Standard turnaround is 24–48 hours from the time we receive your complete intake information. Engineer stamp add-ons (where available) run on a separate timeline.
Purchaser and property details, your contractor/company info, the AHJ and electric utility (where applicable), and vertical-specific equipment and site details. Each vertical lists exactly what it needs on its order page.
Free revisions for AHJ or utility-required corrections — unlimited, until your permit is approved, at no extra charge. If a revision is needed because of a change to your own project specs after ordering (different equipment, layout change, or missed site requirement not caused by the AHJ), a flat $75 revision fee applies to cover the redraw.
All 50 states. We track NEC adoption and formatting by jurisdiction so your plan set matches what your local AHJ expects to see.
Drafting is our core service and doesn't include a stamp by default. Most standard residential systems don't require one. If yours does, we offer an independent licensed engineer's review as an optional add-on — it runs on its own timeline and is not bundled into the base price.

